Quick answer: with the default inputs (10 cu ft, 0.6 cu ft), the bags needed is 17. Change any input to update the result.
Bags needed
—

What this calculator does

This calculator converts a concrete volume into the number of bags to buy. At the default inputs — a 10 cubic-foot pour using standard 80 lb mix — you need 10 ÷ 0.6 = 16.7, which rounds up to 17 bags. Bagged concrete is sold by weight but used by volume, so the yield per bag is the number that matters.

How the bag count formula works

Each bag of dry mix contains cement, sand and gravel in the right proportions; adding water produces a fixed volume of concrete called the yield. Divide your required volume by the yield and round up, because partial bags cannot be mixed accurately and a pour that sets in two stages leaves a weak cold joint. The ceiling in the formula guarantees whole bags.

n=⌈Vy⌉n=\lceil V/y \rceil

Worked example

Take the defaults: 10 cubic feet at a 0.6 cubic-foot yield per 80 lb bag. The division gives 16.67 bags, so order 17 bags — and realistically 18–19 once you add 5–10 percent for spillage and forms that are slightly larger than planned. At $5–$7 per bag that pour costs $85–$130 in materials.

Yield by bag size

Bag sizeYieldBags per cubic yard (27 cu ft)
40 lb0.3 cu ft90 bags
60 lb0.45 cu ft60 bags
80 lb0.6 cu ft45 bags

The 80 lb bag is the standard because it delivers the most concrete per dollar and per trip from the truck. One cubic yard — 27 cubic feet — takes 45 bags of 80 lb mix, which is the practical ceiling for bag work: beyond roughly a yard, a ready-mix truck at $150–$250 for a short load beats hours of hand mixing on both cost and quality.

What changes the bag count

  • Form dimensions — a slab 4 in thick covers 80 sq ft per 27 cubic feet, but every extra half inch of depth adds 12.5 percent to the volume
  • Bag choice — fast-setting and high-strength mixes can yield less per bag than standard mix
  • Waste from spillage, uneven subgrade and over-filled forms, typically 5–10 percent
  • Subgrade absorbency — dry soil steals water and lowers effective yield, so dampen it first

Common mistakes

  • Confusing bag weight with yield — an 80 lb bag does not make 0.8 cubic feet; it makes 0.6
  • Forgetting slab thickness in inches rather than feet: a 10 × 10 slab at 4 in thick is 33.3 cubic feet, not 100
  • Ordering exactly the calculated count with no margin for spillage
  • Mixing more than one bag’s worth by hand at a time — standard mix sets in 20–40 minutes in warm weather

A common silent error is assuming the label yield applies to every mix in the aisle. Fast-setting blends, high-early-strength blends and crack-resistant mixes each have their own yield figure, sometimes 0.55 cubic feet instead of 0.6 — an 8 percent jump in bag count spread across a large pour. Read the yield line, not the weight line, and recompute with this calculator’s yield input set to the value on your actual bags.

Working time and mixing logistics

Bagged mix sets in roughly 20–40 minutes at 70 °F and cures enough to walk on in 24–48 hours, so plan the pour in batches you can place and finish in time. A wheelbarrow and hoe handle one bag at a time; a rented $40–$75 per day mixer triples the pace on anything over about 10 bags. For the default 17-bag job, budget 2–3 hours of mixing and placing with a mixer, or a full morning by hand.

Water temperature and weather

Use roughly 3–4 quarts of water per 80 lb bag — clean water, since organics or salts weaken the paste. Below 50 °F, hydration slows dramatically and fresh concrete needs insulated blankets; above 90 °F, mix sets twice as fast and the subgrade should be dampened to keep water from bleeding into the soil before the paste hydrates. Plan pours for mild mornings when both risks are at their minimum.

Converting your project into cubic feet first

The bag count is only as good as the volume estimate behind it. For slabs, multiply length × width × thickness in feet. For post holes and cylindrical footings, use the cylinder formula — the post hole calculator runs that math per hole and even reports bag counts directly. For general mix proportions rather than bag counts, the concrete mix calculator splits a volume into cement, sand and gravel quantities.

Frequently asked questions

How many 80 lb bags of concrete do I need for 10 cubic feet?

10 ÷ 0.6 = 16.7, so buy 17 bags, and add one or two more for spillage and uneven subgrade.

How many 80 lb bags are in one cubic yard?

One cubic yard is 27 cubic feet, so 27 ÷ 0.6 = 45 bags of 80 lb mix. A 60 lb mix takes 60 bags and a 40 lb mix takes 90.

How much concrete does an 80 lb bag make?

About 0.6 cubic feet, enough for a 2 × 3 ft slab at 4 in depth. A 60 lb bag yields 0.45 cubic feet and a 40 lb bag 0.3.

How many bags for a 10 × 10 slab at 4 inches thick?

The slab is 10 × 10 × 0.333 = 33.3 cubic feet, which takes 33.3 ÷ 0.6 = 55.6, so 56 bags — 60 or more with waste margin.

Should I buy extra bags beyond the calculation?

Yes, add 5–10 percent for spillage, uneven forms and absorbent subgrade. On the default 17-bag pour that means 18–19 bags. Unopened bags can be returned.

When is a ready-mix truck cheaper than bags?

Above roughly one cubic yard, or 27 cubic feet. A truck’s short-load minimum runs $150–$250, which beats mixing 45 bags of 80 lb mix by hand on both time and consistency.

How much does an 80 lb bag of concrete cost?

Typically $5–$7 at big-box stores in 2026. Specialty mixes such as fast-setting or high-strength blends run $7–$10 per bag.

How long does bagged concrete take to set?

Standard mix stiffens in 20–40 minutes at 70 °F, is walkable in 24–48 hours, and reaches most of its strength in 7–28 days. Cold weather slows all of those numbers.

How fast can one person mix concrete by hand?

About 8–10 bags of 80 lb mix per hour by wheelbarrow, or 25–30 bags per hour with a rented mixer. Plan the pour so each batch is placed before it stiffens.

Does the water amount change the yield?

Slightly. Stick to the bag instructions — roughly 3–4 quarts per 80 lb bag. Extra water makes soupy concrete that shrinks more and cures weaker.

Method and sources

Calculation basis

Cost ranges reflect 2026 U.S. national averages for materials and labor; regional pricing varies, so use results as a planning baseline and confirm with local quotes.

Last updated: November 17, 2026
Formula & data sources
  • 80 lb bag of concrete mix yields about 0.6 cu ft; bags = ceil(volume/yield).

Cite this page

Reference formats
APA 7CalcSeed. (2026, November 17). Concrete Bag Calculator. https://calcseed.com/c/home/quikrete-calculator/
MLA 9"Concrete Bag Calculator." CalcSeed, 17 Nov. 2026, calcseed.com/c/home/quikrete-calculator/.
ChicagoCalcSeed. "Concrete Bag Calculator." Last modified November 17, 2026. https://calcseed.com/c/home/quikrete-calculator/

Related calculators

More Home & DIY calculators

People also calculate