Post Hole Calculator
Enter the post count, hole diameter and depth to estimate concrete volume.
What this calculator does
This calculator estimates the concrete volume needed to set fence or deck posts, measured in cubic feet. Each hole is treated as a cylinder. At the default inputs — 10 posts in 12-inch-diameter holes dug 3 ft deep — each hole takes 2.36 cubic feet and the job needs 23.56 cubic feet of concrete, which is about 40 bags of 80-lb mix.
How the post hole volume formula works
Each hole is a cylinder, so its volume is the circular cross-section times the depth. The formula divides the hole diameter in inches by 24 to convert it to a radius in feet, squares it, multiplies by π, then multiplies by the depth in feet and the post count. The post itself displaces some volume, but convention is to ignore that and pour solid — the post stays wetter and the footing resists frost heave better.
Worked example
Take the defaults: a 12-inch hole is 1 ft across, so the radius is 0.5 ft. Per hole: π × 0.5² × 3 = 2.36 cubic feet. For 10 posts: 10 × 2.36 = 23.56 cubic feet. Since an 80-lb bag of concrete mix yields about 0.6 cubic feet, you need 23.56 ÷ 0.6 = 39.3, which rounds up to 40 bags. If you prefer 60-lb bags (0.45 cubic feet each), the same job takes 53 bags.
Concrete per hole by size
| Hole size | Depth | Concrete per hole | 80-lb bags |
|---|---|---|---|
| 10 in diameter | 3 ft | 1.64 cu ft | 3 bags |
| 12 in diameter | 3 ft | 2.36 cu ft | 4 bags |
| 12 in diameter | 4 ft | 3.14 cu ft | 6 bags |
| 18 in diameter | 3 ft | 5.30 cu ft | 9 bags |
The table shows how quickly diameter drives volume: going from a 10-inch to an 18-inch hole at the same depth multiplies concrete use by more than three. Digging the narrowest hole your post size allows saves real money on a long fence run.
Choosing hole diameter and depth
The hole should be roughly three times the post width — 12 inches for a standard 4 × 4, about 18 inches for a 6 × 6. A wider bell at the bottom resists uplift better if your soil heaves. Depth follows two rules: reach below the local frost line so frost cannot lift the post, and bury one-third to one-half of the above-ground height. A 6 ft fence post therefore wants 2–3 ft underground, and deck posts or footings follow the deeper of the two rules.
- Fence posts in most US climates: 12-inch holes, 2–3 ft deep
- Deck footings: sized by local code, typically 10–12 inches wide and to the frost line or 4 ft in northern states
- Mailbox or sign posts: 8–10 inches wide and 2 ft deep is usually enough
- Gate posts: one size larger than line posts because of the constant swing load
Ordering a little extra
Holes are never perfect cylinders — augers bell out the bottom, sandy walls slump, and some mix is always spilled or left in the wheelbarrow. Add 5–10 percent to the calculated total before buying. For the 10-post default job that means 42–44 bags instead of exactly 40. Unopened bags are cheap to return; a pour that runs short sets up in sections and creates a weak cold joint at the worst point.
Common mistakes that leave you short
- Measuring hole diameter at the top after the walls have already slumped inward
- Ignoring the frost line: a 2 ft hole in a 4 ft frost zone heaves the post out within a few winters
- Confusing dry-bag count with mixed yield — an 80-lb bag makes 0.6 cubic feet, not 0.8
- Forgetting that gate and corner posts take more abuse and deserve the next hole size up
Bag yield conversion
Concrete volume is one number; bag count is another. An 80-lb bag yields 0.6 cubic feet mixed, a 60-lb bag 0.45, and a 40-lb bag 0.3. Divide your cubic-foot total by those yields and always round up — 39.3 bags is 40, not 39, because partial bags do not mix accurately.
Bags versus ready-mix trucks
Jobs under roughly 1 cubic yard (27 cubic feet) are usually cheaper with bags. The 10-post default needs 23.56 cubic feet — comfortably in bag territory. A 30-post run at the same hole size needs 70.7 cubic feet, or about 118 bags, at which point a short-load ready-mix truck charging $150–$250 for the delivery minimum often beats hours of mixing by hand. If you also need bag math for a slab or footing pour, the Quikrete calculator converts cubic feet into bag counts, and the fence calculator estimates the post count for a given fence length before you run this concrete math.
Budget about $5–$7 per 80-lb bag in most markets, so the default job’s 42–44 bags run $210–$300 in materials. That is far cheaper than replacing a sagging fence: posts set without proper footings lean within two or three seasons, and a leaning line means unbolting every panel and starting over. Mixing also sets the pace — one person mixing can place about 8–10 bags per hour, so a 40-bag pour is a solid half-day for two people, or a long day alone.
Frequently asked questions
How much concrete do I need per fence post hole?
A 12-inch hole dug 3 ft deep takes 2.36 cubic feet, or four 80-lb bags. A 10-inch hole at the same depth takes 1.64 cubic feet, about three bags.
How wide should a post hole be?
Roughly three times the post width. A 4 × 4 fence post wants a 12-inch hole and a 6 × 6 wants about 18 inches.
How deep should post holes be?
Below the local frost line, and at least one-third to one-half of the above-ground height. A 6 ft fence post needs 2–3 ft of burial; deck footings go to the frost line.
How many bags of concrete for 10 fence posts?
At 12-inch by 3 ft holes, 23.56 cubic feet total ÷ 0.6 cubic feet per 80-lb bag = 39.3, so buy 40 bags and add a couple for spillage.
How much does one 80-lb bag of concrete make?
About 0.6 cubic feet of mixed concrete. A 60-lb bag yields about 0.45 cubic feet and a 40-lb bag about 0.3 cubic feet.
Does the post itself reduce the concrete needed?
A 4 × 4 post displaces only about 0.09 cubic feet per 3 ft of depth, under 4 percent of the hole. The convention is to pour solid and not subtract it.
What happens if my hole is wider at the bottom?
A belled footing adds volume, so recalculate with the larger diameter or simply order 10 percent extra. The bell actually improves uplift resistance in heaving soil.
How much extra concrete should I order?
Add 5–10 percent for slumped walls, spillage and imperfect holes. On the default 10-post job that means 42–44 bags rather than exactly 40.
When is a concrete truck cheaper than bags?
Above roughly 1 cubic yard, or 27 cubic feet. A 30-post job at the defaults needs 70.7 cubic feet, where a short-load delivery usually beats mixing 118 bags by hand.
Can I set a post without concrete?
Tamped gravel or soil works for temporary or light-duty posts, but concrete footings below the frost line are the standard for fences and any structure carrying load.
Method and sources
- Post hole volume = count × π × (diameter/24)² × depth.