Concrete Mix Calculator
Enter the concrete volume and mix ratio to estimate cement, sand and gravel quantities.
What this calculator does
This tool breaks a concrete pour into its three raw ingredients. Enter the finished concrete volume in cubic yards and a mix ratio — cement to sand to gravel by volume — and it returns the cement bag count plus sand and gravel in cubic feet. One cubic yard of the default 1:2:3 mix needs 6.93 bags of cement, 13.86 cu ft of sand and 20.79 cu ft of gravel.
The mix ratio formula
Dry ingredients occupy about 1.54 times the finished concrete volume, because cement and sand fill voids between gravel pieces and the blend compresses once water is added. The calculator converts your cubic yards to cubic feet (×27), inflates by 1.54, then splits that dry total among the parts of the ratio. One bag of Portland cement measures one cubic foot, which is why the cement figure in cubic feet converts to bags one-for-one.
Worked example at the defaults
For 1 cu yd of 1:2:3 mix: dry volume is 1 × 27 × 1.54 = 41.6 cu ft. Six total parts means cement takes one sixth — 41.6 ÷ 6 = 6.93 bags, or buy 7 — sand takes two sixths at 13.86 cu ft, and gravel takes three sixths at 20.79 cu ft. Round every quantity up: partial bags of cement do not store, and a sand or gravel shortage mid-pour is worse than a surplus.
Mix ratios per cubic yard
| Ratio | Cement bags | Sand (cu ft) | Gravel (cu ft) | Typical strength |
|---|---|---|---|---|
| 1:2:3 | 6.93 | 13.86 | 20.79 | ~3,500 psi |
| 1:2:4 | 5.94 | 11.88 | 23.76 | ~3,000 psi |
| 1:3:5 | 4.62 | 13.86 | 23.10 | ~2,000 psi |
Richer mixes carry more cement and more strength. Use 1:2:3 for slabs, driveways and anything structural; 1:2:4 suits walks and shed bases; 1:3:5 belongs to footings and mass fill where compressive strength matters less. In 2026, a 94 lb bag of Portland cement costs $12–$18, sand runs $20–$40 per ton and gravel $15–$35 per ton, so the raw materials for a cubic yard of 1:2:3 land around $110–$170 — versus $150–$220 for ready-mix delivered, which wins on quality once a job exceeds about a yard.
The water ratio is the quiet variable
The mix ratio counts only dry ingredients; water decides the strength on its own. Target a water-to-cement ratio by weight of 0.45–0.6 — roughly 5–6 gallons of water per bag of cement — and add it gradually, because wetter mixes pour easier but set weaker. Every extra gallon beyond the ratio can cost 10–15% of compressive strength. The mix should slump like thick oatmeal, hold its shape when sliced with a shovel, and show a sheen of water on top rather than a puddle.
Batching in practice
Measure with the same container all day — a 5-gallon bucket works — and keep the counts consistent: one bucket of cement, two of sand, three of gravel for the default ratio. Damp sand bulks up to 20% over dry sand, so a morning measured with wet sand and an afternoon measured with dry sand produces two different concretes. Mix in a rented mixer ($40–$70 per day) for anything over about a quarter yard; hand-mixing in a wheelbarrow is practical only below that.
Common mistakes
- Adding water until the mix pours like soup — the fastest way to lose strength; stick to the 0.45–0.6 water-cement ratio
- Switching measuring containers mid-job — ratio errors compound invisibly in the finished slab
- Ignoring the 1.54 dry-volume factor — ordering the finished volume in raw materials leaves the pour one third short
- Forgetting curing — concrete gains most strength with moisture; cover the pour and keep it wet for at least 5–7 days
- Pouring on frozen or muddy ground — subgrade movement cracks even a perfect mix
Bags versus ready-mix
The bag route scales badly. One cubic yard is 6.93 bags of cement plus 34.7 cu ft of aggregate — about 60 wheelbarrow loads of material and 45+ mixer batches. Past roughly one cubic yard, ready-mix concrete at $150–$220 per yard delivered beats the labor, the batch-to-batch variation and the 2026 bag prices; a truck also pours in minutes while hand batching takes all day, which matters because cold joints form when fresh concrete meets concrete that has already stiffened. Below a yard — post footings, a shed base, a short walk — bagging your own 1:2:3 mix remains cheaper and entirely practical. For the volume itself, the concrete calculator converts slab dimensions into cubic yards before any of this mixing math starts.
Frequently asked questions
What does a 1:2:3 concrete mix mean?
One part cement, two parts sand and three parts gravel, all measured by volume with the same container. It produces roughly 3,500 psi concrete suitable for slabs and driveways.
How many bags of cement for one cubic yard of concrete?
A 1:2:3 mix needs 6.93 bags per cubic yard, so buy 7. Leaner 1:2:4 needs 5.94 bags and 1:3:5 needs 4.62 bags for the same volume.
Why multiply the volume by 1.54?
Dry ingredients occupy about 1.54 times the finished concrete volume because cement and sand fill the voids between gravel pieces. Ordering the finished volume directly in raw materials would leave the pour one third short.
How much sand and gravel for a cubic yard of 1:2:3?
13.86 cu ft of sand and 20.79 cu ft of gravel — about half a ton of sand and three quarters of a ton of gravel. Round up when ordering by the ton.
Which mix ratio is strongest?
1:2:3, with the highest cement share of the three ratios here, at roughly 3,500 psi. Use it for slabs and structural work; 1:3:5 at about 2,000 psi suits footings and mass fill.
How much water should I add to a concrete mix?
Aim for a water-to-cement weight ratio of 0.45–0.6, about 5–6 gallons per bag of cement. Extra water weakens concrete — each gallon beyond the ratio can cost 10–15% of strength.
Can I mix concrete by hand?
Yes, below about a quarter cubic yard in a wheelbarrow with a hoe or shovel. Beyond that, rent a mixer for $40–$70 per day; hand batching a full yard means 45 or more batches and a cold joint risk.
How much does a cubic yard of concrete cost in 2026?
Bagged raw materials for a 1:2:3 mix run about $110–$170, and ready-mix delivered runs $150–$220 per yard. Past one cubic yard, ready-mix usually wins on price and quality.
Why did my concrete turn out weak or crumbly?
The usual causes are too much water, a ratio that drifted because measuring containers changed mid-job, and dry curing. Keep the water ratio fixed, batch consistently, and keep the pour damp for 5–7 days.
Does damp sand change the mix?
Yes — damp sand can bulk up to 20% more volume than dry sand, so measuring by bucket with wet sand delivers more sand per shovel than the ratio intends. Measure the same way throughout the job and adjust if the mix looks soupy or stiff.
Method and sources
- Concrete mix ratios by volume; dry volume factor ~1.54; 1 cement bag ≈ 1 cu ft.