Gravel Calculator
Enter the length, width and depth to estimate gravel in cubic yards and tons.
How much gravel you need
Compute volume in cubic yards (length × width × depth, all in feet, divided by 27), then convert to tons. Gravel weighs about 1.4 tons per cubic yard, depending on the stone.
Gravel for a 10×20 area
| Depth | Cubic yards | Tons |
|---|---|---|
| 2″ | 1.23 yd | 1.73 tons |
| 4″ | 2.47 yd | 3.46 tons |
| 6″ | 3.70 yd | 5.19 tons |
Choose the right depth
Paths usually need 2–3 inches, driveways 4–6 inches (deeper for heavy vehicles). A 4-inch base is the common minimum for a stable driveway.
Yards or tons: the two answers are the same pile twice
The screen gives you one pile described two ways: the default 20 × 10 ft at 4″ is 2.47 cubic yards and 3.46 tons. Everything up to the yard figure is geometry you can trust. The ton figure is that geometry multiplied by a single hard-wired guess about the stone — 1.4 tons to the cubic yard — and that guess is worth checking before you place an order, because suppliers weigh what comes out of the pit and measure what comes to your drive.
| If the stone is really this dense | What 2.47 yd weighs | Cost at $45/ton | What 3.46 tons of it spreads to at 20×10 |
|---|---|---|---|
| 1.2 t/yd (dry, angular, light) | 2.96 tons | $133.33 | 4.67 in |
| 1.4 t/yd (what the tool assumes) | 3.46 tons | $155.56 | 4.00 in |
| 1.7 t/yd (wet crushed basalt) | 4.20 tons | $188.89 | 3.29 in |
Read the last column before you pay. If you quote the pit the tons figure and the stone is heavier than the calculator assumed, 3.46 tons is barely 2.03 cubic yards and the 4″ bed you planned is 3.3″ once it is spread — thin enough to rut under a delivery truck. At the light end the same tonnage buys 2.88 yards and 4.7 inches of depth for the same money. In dollars, the default order is a $133.33–$188.89 range decided entirely by a constant the form never asks you about.
Bulk or bags: 56 bags to the cubic yard
The density figure has a second use. 1.4 tons to the yard is 103.7 lb per cubic foot, so a 50 lb bag holds about 0.48 cu ft and it takes 56 bags to make one yard — which means the default order is 139 bags to carry, cut open and tip. That is the actual reason nobody bags a driveway.
| Shelf price per 50 lb bag | Per cubic yard | The default 2.47 yd | Against bulk at $45/ton |
|---|---|---|---|
| $3 | $168.00 | $414.81 | 2.7× |
| $4 | $224.00 | $553.09 | 3.6× |
| $6 | $336.00 | $829.63 | 5.3× |
| $8 | $448.00 | $1,106.17 | 7.1× |
Bulk gravel at $45 a ton contains $1.13 of stone in a 50 lb bag. Every shelf price above that figure is the bag, the pallet and the walk from the car — and the table shows how far above it the hardware store is. The exception is scale, not price: a 10 × 10 ft patch at 2″ is 0.617 cubic yards and 0.86 tons, roughly 35 bags, and no yard will send a truck for two-thirds of a yard. Below about a yard and a half the question is not which is cheaper but what will deliver. Pricing a delivered load — with the rate box this page does not have — is the job of the gravel driveway cost calculator.
Depth is the only lever, and it is worth 0.86 tons an inch
Length and width describe a hole you can look at. Depth is a number you type, and it scales the entire order in direct proportion. On the default 20 × 10 ft area, one inch is 0.617 cubic yards, 0.864 tons and $38.89 at $45 a ton — and the box will let you go anywhere from 1 to 24 inches of it.
| Depth | Cubic feet | Cubic yards | Tons | At $45/ton |
|---|---|---|---|---|
| 1 in | 16.67 | 0.617 | 0.864 | $38.89 |
| 2 in | 33.33 | 1.235 | 1.728 | $77.78 |
| 3 in | 50.00 | 1.852 | 2.593 | $116.67 |
| 4 in | 66.67 | 2.469 | 3.457 | $155.56 |
| 5 in | 83.33 | 3.086 | 4.321 | $194.44 |
| 6 in | 100.00 | 3.704 | 5.185 | $233.33 |
| 8 in | 133.33 | 4.938 | 6.914 | $311.11 |
| 12 in | 200.00 | 7.407 | 10.370 | $466.67 |
One thing the box cannot do is split the depth into layers. A real drive is 4″ of 3/4″ minus compacted into the subgrade plus a 2″ top course of 1/4″ chip — the same total inches, two different stones, two different prices per ton, and a compaction loss in the base that the topping does not make up. Run this calculator twice with two depths and add the answers, and see the gravel driveway calculator for a form that already knows about courses.
Nothing here adds for compaction
The flooring and tile calculators give you a waste percentage to set. This page gives you none, which is fair for a material you cannot cut but is not the number you should order: loose stone drops a tenth to a quarter of its depth the first time a plate compactor or a delivery truck crosses it. Add the allowance by hand.
| Allowance on the default order | Cubic yards | Tons | Cost at $45/ton | Extra spend |
|---|---|---|---|---|
| none (what the tool says) | 2.469 | 3.457 | $155.56 | — |
| +10% | 2.716 | 3.802 | $171.11 | $15.56 |
| +15% | 2.840 | 3.975 | $178.89 | $23.33 |
| +20% | 2.963 | 4.148 | $186.67 | $31.11 |
| +25% | 3.086 | 4.321 | $194.44 | $38.89 |
The bottom row is the useful coincidence: on this 20 × 10 ft area, adding 25% to the order costs exactly the same as adding one inch of depth — 0.617 yards and $38.89 either way. So if you are choosing between ordering more stone and simply ordering it deeper, the deeper bed is the one that will still be there in five years.
Sanity-check the answer in square feet
Before a truck backs up your drive it is worth converting the volume back into ground. One cubic yard is 27 cubic feet, which spreads over 81 sq ft at 4″, 108 at 3″ and 54 at 6″; one ton of this stone is 0.714 yards, so it covers 57.9 sq ft at 4″. A 10-ton load is therefore 7.14 yards and about 579 sq ft at 4″ — rather less than the 2,000 sq ft a 200 × 10 ft driveway at the same depth asks for, which is 24.69 yards, 34.57 tons and roughly 2.5 truckloads at $1,555.56 of stone.
How the tool behaves at the edges
- A blank field is a zero, not a default. Clear the depth box and the answer is 0 cubic yards and 0 tons, with nothing on the page to say which field went empty.
- Negative dimensions are accepted. A width of −10 ft reports −2.47 yards and −3.46 tons. There is no rounding here, so the negative survives cleanly all the way to the answer.
- Depth is whole inches, and the box stops at 24. Length stops at 500 ft and width at 200 ft, so the largest answer the form will produce is 7,407 cubic yards and 10,370 tons — a quarry, not a driveway.
- At the other end, 1 × 1 ft at 1″ is 0.003 yards and 0.004 tons. Arithmetically right and unbuyable; anything under about a quarter of a yard is a bag job decided in the aisle, not by this page.
- There is no price field at all. Every dollar figure above comes from multiplying the tons by the $45 default on the cost page, by hand.
- There is no Solve-for control. None of the three fields is marked solvable, so the tool will not back out a depth from a delivered load. Divide the volume you have by the area you are standing on.
- Only one rectangle is modelled. A fan-shaped entrance or a circular turnaround has to be measured as an area first, then divided by the width you type in — the tool multiplies two numbers and knows nothing about shapes.
What this calculator leaves out
- Excavation. A 4″ bed of stone needs 4″ of dirt to come out first, and the topsoil has to go somewhere — see the topsoil calculator for that volume.
- The subgrade. Stone spread on soft clay sinks and ruts no matter how deep you ordered it; compacted base is what makes the depth figure true.
- Landscape fabric and edging. Both are priced per roll or per linear foot, neither is a volume, and skipping the fabric is how gravel ends up in the lawn.
- Drainage. A drive needs a crown or a fall to the sides, which makes depth a range rather than the single number you typed.
- Delivery minimums, short-load and dirt-road fees. They can exceed the cost of the stone itself on a small order.
- Spreading labour. A ton does not push itself, and the last half-inch that makes a drive level is hours of rake.
- Stone type. 3/4″ minus, clear drain rock, crusher run and decorative stone all have different densities, prices and how well they lock together — and the 1.4 in this formula cannot tell them apart. The landscape rock calculator and the sand calculator use their own constants for the same problem.
Frequently asked questions
How many tons is a cubic yard of gravel?
About 1.4 tons, though it ranges from roughly 1.2 to 1.7 tons depending on the stone and moisture.
How deep should a gravel driveway be?
Four to six inches is typical; use the deeper end for heavier vehicles.
How do I calculate cubic yards?
Multiply length by width by depth in feet, then divide by 27.
Why does the depth I ordered not match the depth I got?
Because 1.4 tons per yard is an assumption. If you buy the tonnage the calculator reports and the stone is denser — wet crushed rock runs near 1.7 tons a yard — 3.46 tons is only 2.03 cubic yards, which spreads to 3.3 inches over the default 20 × 10 ft area instead of 4. Light dry stone at 1.2 gives you 4.7 inches. Order by the yard, or check the pit’s density first.
How many bags of gravel do I need?
At this density, 56 bags of 50 lb make a cubic yard, so the default 2.47 yards is 139 bags. Bulk gravel at $45 a ton is only $1.13 of stone per bag — the rest of a $6 bag is packaging and delivery to the shelf. Bags make sense below roughly a yard and a half, where no yard will deliver.
Should I order by the yard or by the ton?
Both lines on the screen describe the same pile: 2.47 yards is 3.46 tons. Quarry-run stone is usually sold by weight and delivered stone by volume, so quote the number the supplier uses. At $45 a ton the default order is $155.56 of gravel, and $10 to $15 of that is a compaction allowance you have to add yourself.
Does the calculator add anything for compaction?
No. There is no waste box on this page, unlike the flooring and tile calculators. Adding 20% to the default order takes it to 2.96 yards and 4.15 tons, and 25% — 3.09 yards, $38.89 more — happens to be exactly the same as making the bed one inch deeper on the same area.
How much area does a ton of gravel cover?
57.9 square feet at 4 inches, 116 at 2 inches and 38.6 at 6 inches, on this calculator’s 1.4 tons per yard. A cubic yard covers 81 square feet at 4 inches. So a 10-ton load is 7.14 yards and about 579 square feet at driveway depth.
How many truckloads is a gravel driveway?
A 120 × 10 ft drive at 4″ is 14.81 cubic yards and 20.74 tons, which is about 1.5 loads on a 10-yard truck. The same drive lengthened to 200 ft needs 24.69 yards and 2.5 loads. Deliveries are rarely split below a yard or two, so small jobs go in bags.
Why does my answer say 0?
One of the three fields is empty. Nothing behind these boxes is a fallback: an emptied depth box makes the volume, the yards and the tons all read zero even though the length and width still show 20 and 10.
Method and sources
- Gravel volume = l × w × d ÷ 324 cubic yards; density ~1.4 tons per cubic yard.