---
slug: part-cycle-time-calculator
title: "Part Cycle Time Calculator"
category: machining
updated: 2026-11-18
canonical: https://calcseed.com/c/machining/part-cycle-time-calculator/
html: /c/machining/part-cycle-time-calculator/
---

# Part Cycle Time Calculator

Calculate the cycle time per part from cutting length, feed rate and load/unload time. Free and instant.

## Quick answer

**Quick answer:** with the default inputs (6 in, 20 in/min, 30 sec), the cycle time is **48**. At these inputs: cutting time = **18**. Change any input to update the result.

## Default calculation

Values computed by this calculator at exactly the default inputs listed below.

### Inputs (defaults)

| Input | Value | Unit |
| --- | --- | --- |
| Cutting length | 6 | in |
| Feed rate | 20 | in/min |
| Load / unload | 30 | sec |

### Outputs at these defaults

| Output | Value | Unit |
| --- | --- | --- |
| Cycle time | 48 |  |
| Cutting time | 18 |  |

## Formula

```text
t_cut_ = L ÷ F × 60  &middot;  t_cycle_ = t_cut_ + t_load_
```

## Inputs

| Variable | Type | Unit | Default |
| --- | --- | --- | --- |
| Cutting length | number | in | 6 |
| Feed rate | number | in/min | 20 |
| Load / unload | number | sec | 30 |

## Outputs

| Result | Format |
| --- | --- |
| Cycle time | primary |
| Cutting time | number |
| Cycle time | number |

## How it works

### What this calculator returns

This tool returns two times in seconds: the cutting time for one part and the full cycle time including load and unload. At the defaults — 6 in of cutting at 20 in/min with 30 seconds of load/unload — cutting takes **18 seconds** and the cycle is **48 seconds**. Multiply the cycle by your burdened rate and you have the machine cost of one part.

### The cycle time formula

**L** is the total cutting length in inches — every programmed move that removes metal, summed. **F** is the feed in inches per minute. Dividing gives minutes, and the 60 converts to seconds because shop time is quoted in seconds per part. **t_load_** covers everything that happens with the spindle stopped: opening the door, unclamping, swapping the part, re-clamping, closing the door and pressing cycle start.

The split between the two terms is what makes the number useful. At the defaults, cutting is 18 of the 48 seconds, or 37.5 percent of the cycle. The other 62.5 percent is handling, which means a 25 percent faster feed saves only 4.5 seconds while a 25 percent faster load saves 7.5 seconds. Knowing which term dominates tells you where to spend effort.

### Worked example at the defaults

A part needs 6 in of cutting at 20 in/min. Cut time = 6 ÷ 20 × 60 = 0.3 minutes = **18 seconds**. Add 30 seconds of load/unload for a cycle of **48 seconds**. At a burdened rate of $75/hr, that is $1.00 of machine time per part, of which $0.63 is handling.

Now scale it: 48 seconds is 75 parts per hour at 100 percent utilisation. A realistic 80 percent gives 60 parts per hour, and a 7.5-hour productive shift yields 450 parts. Quoting 75 per hour on a machine that actually delivers 60 understates the price by 20 percent, which on a 1,000-part order is 200 parts of unpaid time.

### Cycle time by feed rate

| Feed rate | Cut time, 6 in | Cycle, 30 s load | Parts per hour at 100% |
| --- | --- | --- | --- |
| 10 in/min | 36.0 s | 66.0 s | 54.5 |
| 20 in/min | 18.0 s | 48.0 s | 75.0 |
| 40 in/min | 9.0 s | 39.0 s | 92.3 |
| 60 in/min | 6.0 s | 36.0 s | 100.0 |
| 100 in/min | 3.6 s | 33.6 s | 107.1 |

The last two columns are the point of the table. Going from 20 to 40 in/min halves cutting time but improves the cycle by only 19 percent, because the fixed 30 seconds stays. Going from 40 to 100 in/min takes another 12.9 seconds out of cutting but only 5.4 seconds out of the cycle. Feed rate has diminishing returns the moment handling exceeds cutting.

### Parts per shift with realistic utilisation

| Cycle time | Parts/hr at 100% | At 85% OEE | Parts in 7.5 hr shift |
| --- | --- | --- | --- |
| 30 s | 120.0 | 102.0 | 765 |
| 48 s | 75.0 | 63.8 | 478 |
| 60 s | 60.0 | 51.0 | 382 |
| 90 s | 40.0 | 34.0 | 255 |
| 120 s | 30.0 | 25.5 | 191 |

A 48 second cycle is 75 parts per hour on paper, 63.8 at 85 percent overall equipment effectiveness, and 478 in a 7.5 hour shift once you subtract breaks and the shift-start warm-up. The 85 percent factor covers minor stops, tool changes, inspection and the occasional scrapped part. Use it instead of the ideal number whenever you are committing to a delivery date.

Takt time is the same arithmetic in reverse. If the customer needs 400 parts in a 7.5 hour shift, takt is 67.5 seconds, and a 48 second cycle leaves 19.5 seconds of slack per part — enough to absorb one tool change every 40 parts, but not two. Compare cycle against takt before deciding whether to add a second machine or a second shift.

### What moves the cycle time

- **Cutting length.** Linear and usually the largest term in high-volume work: 6 in to 9 in adds 9 seconds at 20 in/min.
- **Feed rate.** Linear in cutting time only, so its leverage falls as the handling share grows.
- **Load/unload.** Fixed per cycle: 30 s to 20 s cuts a 48 s cycle to 38 s, a 21 percent gain.
- **Tool changes.** A 4-second chip-to-chip change every 50 parts adds 0.08 s to the average cycle, which is why it is often ignored and occasionally not.
- **Rapids and air moves.** Not in L if you counted only cutting moves; on a short cycle the traverse back can be 3–5 seconds.

### Mistakes in cycle time estimates

#### Counting the programmed path instead of the cutting path

CAM reports total path length, which includes rapids, entry moves and retracts. On a 6 in cut with a 4 in rapid back and two 0.5 in lead-ins, the programmed length is 11 in but the cutting length is 7 in. Using 11 in at 20 in/min gives 33 seconds instead of 21, a 57 percent overestimate that can lose a job you should have won.

#### Assuming the operator is as fast as the time study

A 30 second load/unload is a good manual figure for a small part in a vise with a torque wrench. Add 5–8 seconds if the part needs deburring in cycle, 10 if it is heavy enough to need a hoist, and 15–20 if each part gets a gauge check. These are the differences between a quoted 75 parts per hour and a delivered 55.

#### Forgetting the second operation

A part that is turned on one face and milled on the other has two cycles plus a transfer. Quoting a single 48 second cycle for both sides halves the real machine time and doubles the apparent capacity. Sum every operation, then add the handling between them.

### Cutting faster or loading faster

With cutting at 18 seconds and handling at 30, the highest-leverage change is handling: a second vise jaw that lets you swap while the spindle runs removes most of the 30 seconds and takes the cycle toward 20. A 50 percent feed increase takes the cycle only from 48 to 39 seconds. Spend the money on fixturing first, then on tooling, then on the program — in that order, because that is the order of the seconds available.

- Pallet changer or second vise: 15–25 s off the handling term.
- Feed from 20 to 40 in/min: 9 s off cutting.
- Deburring moved in-cycle: 5–8 s, but it replaces a separate operation.
- Removing air moves and lead-outs: 3–5 s, and free if you edit the program.

## FAQ

### How do I calculate cycle time per part?

Divide the cutting length by the feed rate to get minutes, multiply by 60 for seconds, then add load/unload. At 6 in and 20 in/min: 18 s of cutting plus 30 s handling = 48 s.

### What is included in load/unload time?

Opening the door, unclamping, swapping the part, re-clamping, closing the door and pressing start. Add deburring, gauging or hoist time if the part needs it, which can push 30 s to 50 s.

### How many parts per hour is a 48 second cycle?

75 at 100 percent utilisation, or about 64 at a realistic 85 percent OEE. That is 478 parts in a 7.5 hour shift rather than the 563 the ideal number suggests.

### Why is cycle time measured in seconds?

Seconds keep the handling share visible. A 0.8 minute cycle hides the fact that 30 of its 48 seconds are not cutting, which is exactly the number that decides whether to invest in fixturing.

### Does a faster feed rate always shorten the cycle?

It shortens only the cutting term. Doubling feed from 20 to 40 in/min turns 48 s into 39 s, a 19 percent gain, because the 30 s of handling does not move.

### What utilisation should I use for quoting?

85 percent OEE for a stable process, 75–80 percent for one with frequent tool changes or inspection. On a 48 s cycle that is 64 or 60 parts per hour, not 75.

### Should rapid moves be included in cutting length?

No. Rapids do not remove metal and travel at 400–1,000 in/min, not 20. Including a 4 in rapid in a 6 in cut overstates cutting time by 20 seconds.

### How much does a tool change add to the cycle?

A 4 second chip-to-chip change every 50 parts adds 0.08 s per part. Every 10 parts it adds 0.4 s, which is why high-volume jobs count it and short runs do not.

### How do I cut a 48 second cycle to 30 seconds?

Remove handling, not feed. Trimming load/unload from 30 s to 15 s gives 33 s; raising feed 50 percent gives 39 s. A pallet changer or second vise gets you closer to the first number.

## Method and sources

Methodology: Formulas follow standard machining practice consistent with Machinery’s Handbook conventions; always verify final settings against the tooling supplier’s data.

Last updated: 2026-11-18.
- Cycle time = cutting time + load/unload time; cutting time = length / feed rate.
