---
slug: load-bearing-wall-calculator
title: "Load Bearing Wall Calculator"
category: home
updated: 2026-11-17
canonical: https://calcseed.com/c/home/load-bearing-wall-calculator/
html: /c/home/load-bearing-wall-calculator/
---

# Load Bearing Wall Calculator

Estimate the uniform load and a starting beam depth for a load-bearing wall opening.

## Quick answer

**Quick answer:** with the default inputs (14 ft, 10 ft, 50 lb/sq ft), the total load is **7,000**. At these inputs: uniform load = **500**, suggested beam depth = **8.4**. Change any input to update the result.

## Default calculation

Values computed by this calculator at exactly the default inputs listed below.

### Inputs (defaults)

| Input | Value | Unit |
| --- | --- | --- |
| Opening span | 14 | ft |
| Tributary width | 10 | ft |
| Design load | 50 | lb/sq ft |

### Outputs at these defaults

| Output | Value | Unit |
| --- | --- | --- |
| Total load | 7000 |  |
| Uniform load | 500 |  |
| Suggested beam depth | 8.4 |  |

## Formula

```text
uniform load = load × tributary width; depth ≈ span × 12 ÷ 20
```

## Inputs

| Variable | Type | Unit | Default |
| --- | --- | --- | --- |
| Opening span | number | ft | 14 |
| Tributary width | number | ft | 10 |
| Design load | number | lb/sq ft | 50 |

## Outputs

| Result | Format |
| --- | --- |
| Total load | primary |
| Uniform load | number |
| Total load on beam | number |
| Suggested beam depth | number |

## How it works

### What this calculator does

This calculator estimates the load a beam must carry when you open up a load-bearing wall, and applies a depth rule of thumb as a starting point. At the defaults—a **14 ft** opening, **10 ft** of tributary width and a **50 lb/sq ft** design load—the beam sees a uniform load of **500 lb/ft**, a total of **7,000 lb**, and the span/20 rule suggests a depth of **8.4 in**, which is what a 9-1/2 in LVL or a double 2×10 header begins to approach. Those numbers give you the vocabulary for a real engineered drawing, not a substitute for one.

### How a beam carries a wall

Removing part of a load-bearing wall requires a header or beam. The beam carries the floor and roof loads from the **tributary width** on each side of the opening.

Multiply the design load by the tributary width to get the uniform load along the beam in pounds per foot, then by the span to get the total weight. The suggested depth is the classic **span/20** rule: depth in inches ≈ span in feet × 12 ÷ 20. It is a sizing heuristic, not a code check—deflection limits, bearing length and lateral bracing all change the final section.

#### Tributary width explained

The tributary width is the distance of floor or roof that funnels into this beam. If the beam sits midway between two parallel supports 20 ft apart, each side contributes half its span, so the tributary width is 10 ft—exactly the default. If the beam is near one edge of the house, the tributary width shrinks and the load drops proportionally; if floor joists land on it from both sides at a longer spacing, it grows. Walking the joist direction in the basement or attic is the fastest way to see what feeds the wall.

### Worked example at the defaults

With a 50 lb/sq ft design load over 10 ft of tributary width, the uniform load is 50 × 10 = **500 lb/ft**. Over a 14 ft opening that totals 500 × 14 = **7,000 lb**—the weight of a full-size pickup truck sitting mid-span, permanently. The depth rule gives 14 × 12 ÷ 20 = **8.4 in**, so real options are a 9-1/2 in LVL pair, a flitch beam, or a shallow steel section; doubled 2×10s at 9.25 in sit just under the suggestion and depend entirely on the wood species and grade.

### Suggested depth by span

| Opening span | Depth rule (span/20) | Typical real-world match |
| --- | --- | --- |
| 8 ft | 4.8 in | Double 2×6 or 5-1/2 in LVL |
| 10 ft | 6.0 in | Double 2×8 or 7-1/4 in LVL |
| 12 ft | 7.2 in | Double 2×10 or 9-1/2 in LVL |
| 14 ft | 8.4 in | 9-1/2 in LVL pair or W8 steel |
| 16 ft | 9.6 in | 11-7/8 in LVL or steel beam |
| 20 ft | 12.0 in | Engineered girder or steel—get an engineer |

Read the third column as orientation for a conversation with a designer or lumberyard, never as a purchase list. Species, grade, load duration and bearing conditions move the answer in both directions, and a 20 ft opening is firmly engineer territory.

### What changes the real beam size

- Load above: a second story or tile roof can double the design load from 50 to 100 lb/sq ft
- Deflection limits: floors demand stiffer beams than roofs, and longer spans need more than the span/20 rule
- Material: LVL and steel carry more load in a shallower depth than sawn lumber
- Bearing length at each end; posts must transfer 7,000 lb or more to the foundation
- Load duration and moisture: a wet basement beam cannot match a dry interior one

The design load default of 50 lb/sq ft corresponds to a typical code minimum floor—40 lb of live load plus about 10 lb of dead load. Add real weights on top of that estimate if there is a bathtub, a safe, a library wall or a tile-roof section above the opening.

### Permits, safety and temporary support

Nearly every US jurisdiction requires a permit to remove or alter a load-bearing wall, with fees around $100–$500 plus structural drawings that run $300–$1,500 for a simple opening. Before any demolition, the load must be intercepted: build temporary stud walls or adjustable steel posts 3–4 ft back from the wall on both sides, and never cut studs while the load is still traveling through them. Inspectors typically want to see the temporary support before the wall comes down and the beam before it is closed in.

#### Important cautions

- This is a starting estimate, not a structural design.
- Species, grade and load duration change the required size.
- Always have an engineer or building official confirm the beam.

### What the project costs in 2026

A routine opening of this size—beam, posts, temporary shoring, drywall patch and labor—runs **$1,500–$5,000** in most US markets, with LVL cheaper than steel and costs climbing past $10,000 when the beam spans a basement and needs new footings for posts. Engineering and permit add the $400–$2,000 range noted above. The beam itself is rarely the expensive part; the posts, footings and finishes are.

### Common mistakes

- Sizing the beam for today&rsquo;s loads and ignoring a future second story or heavy spa above
- Setting the beam on existing subfloor instead of new posts down to footing
- Skipping the engineer and relying on a lumberyard counter recommendation
- Removing temporary supports before the beam is fully fastened and shimmed
- Forgetting ceiling drywall and crown molding hide wiring and ducts that must be rerouted

The most expensive mistake is the first one: retrofitting a beam after loads have grown costs several times what oversizing at day one costs, because the ceiling and floor above are finished by then.

## FAQ

### How do I know if a wall is load bearing?

Check whether floor or roof joists rest on it: joists that run perpendicular to the wall and land on its top plate make it load bearing. Exterior walls almost always are, and a wall directly above a basement beam or girder usually carries load too.

### What size beam do I need for a 14 ft opening?

The span/20 rule suggests a depth of about 8.4 in, which points to a 9-1/2 in LVL pair or a shallow steel section at the default 500 lb/ft load. Treat that as a starting point and have an engineer size the final beam—grade and deflection limits move the answer.

### What does the 50 lb/sq ft design load include?

It approximates a code-minimum floor: 40 lb of live load (people, furniture) plus roughly 10 lb of dead load (framing, drywall, flooring). Add to it if a bathtub, safe or roof section sits above the opening.

### What is tributary width?

It is the width of floor or roof whose weight funnels into the beam—half the span of the joists on each side that bear on it. A beam centered between supports 20 ft apart has a 10 ft tributary width, which is the default here.

### How much weight does a beam over a 14 ft opening carry?

At the default inputs, 500 lb/ft × 14 ft = 7,000 lb total, about the weight of a full-size pickup resting mid-span. Every extra foot of tributary width at 50 lb/sq ft adds 700 lb to the total.

### Do I need a permit to remove a load-bearing wall?

Yes, in nearly every US jurisdiction. Expect $100–$500 in permit fees plus $300–$1,500 for structural drawings on a simple opening, and inspections of the temporary support before demolition.

### Can I remove a load-bearing wall myself?

Only with proper temporary support and an engineered plan; otherwise the structure can be damaged. Build shoring walls 3–4 ft back on both sides, keep the load intercepted until the new beam is fastened and shimmed, and have the inspector see the work at both checkpoints.

### How much does it cost to remove a load-bearing wall?

A typical 12–16 ft opening runs $1,500–$5,000 including the beam, posts, labor and patching, with engineering and permits adding $400–$2,000. Projects that need new footings or steel can pass $10,000.

### Is a steel beam better than LVL?

Steel carries more load in less depth—useful when ceiling height is tight—but it costs more, is harder to cut on site, and needs a welder or bolted connections for the posts. LVL is cheaper, lighter to handle and the default choice for openings under about 16 ft.

## Method and sources

Methodology: Cost ranges reflect 2026 U.S. national averages for materials and labor; regional pricing varies, so use results as a planning baseline and confirm with local quotes.

Last updated: 2026-11-17.
- Beam load from tributary width and design load; beam depth rule of thumb of span/20.
