Estimate gravel driveway cost from area, depth and the delivered price per ton.

## Quick answer

**Quick answer:** with the default inputs (480 sq ft, 6 in, 45 $/ton, $150), the total cost is **$710.00**. At these inputs: gravel volume = **8.89**, tons needed = **12.44**. Change any input to update the result.

## Default calculation

Values computed by this calculator at exactly the default inputs listed below.

### Inputs (defaults)

| Input | Value | Unit |
| --- | --- | --- |
| Driveway area | 480 | sq ft |
| Gravel depth | 6 | in |
| Gravel price | 45 | $/ton |
| Delivery & grading | 150 | $ |

### Outputs at these defaults

| Output | Value | Unit |
| --- | --- | --- |
| Total cost | 710 |  |
| Gravel volume | 8.88889 |  |
| Tons needed | 12.4444 |  |
| Gravel cost | 560 |  |

## Formula

```text
tons = area × (depth ÷ 12) ÷ 27 × 1.4
```

## Inputs

| Variable | Type | Unit | Default |
| --- | --- | --- | --- |
| Driveway area | number | sq ft | 480 |
| Gravel depth | number | in | 6 |
| Gravel price | number | $/ton | 45 |
| Delivery & grading | number | $ | 150 |

## Outputs

| Result | Format |
| --- | --- |
| Total cost | primary |
| Gravel volume | number |
| Tons needed | number |
| Gravel cost | currency |
| Total cost | currency |

## How it works

### What this calculator returns

The tool returns the gravel volume in cubic yards, the weight in tons, the stone cost and the delivered total. At the defaults of 480 sq ft, 6 in of depth, $45 per ton and a $150 delivery charge, you need **8.89 cu yd** and **12.44 tons**, the stone costs **$560** and the total is **$710**, or $1.48 per square foot.

### How the tonnage formula works

The ÷ 12 turns inches of depth into feet, the ÷ 27 turns cubic feet into cubic yards, and the 1.4 converts volume to weight. Crushed stone at about 1.4 tons per cubic yard is the figure that matters, because quarries sell by the ton while your driveway is a volume.

Dividing by 324 does the first two steps at once, since 12 × 27 = 324. That makes the rule easy to hold in your head: square feet times inches, divided by 324, times 1.4. For a 480 sq ft driveway that is 480 × 6 = 2,880, divided by 324 = 8.89 cu yd, times 1.4 = 12.44 tons.

### Worked example at 480 sq ft and 6 in

A 12 × 40 ft driveway is 480 sq ft. At 6 in deep, the volume is 240 cu ft, or 8.89 cu yd. At 1.4 tons per yard that is **12.44 tons**, and at $45 per ton the stone is **$560**. Add $150 for delivery and spreading and the total is **$710**.

Twelve and a half tons is a single tri-axle load, which is the practical reason this driveway size is so common: it fits one truck, so you pay one delivery fee. Push to 700 sq ft at the same depth and you need 18.1 tons, which now risks a second truck and a second $150 charge.

### Tons needed by depth

| Depth | Volume | Tons | Stone at $45/ton | Total with delivery |
| --- | --- | --- | --- | --- |
| 2 in | 2.96 cu yd | 4.15 | $187 | $337 |
| 4 in | 5.93 cu yd | 8.30 | $373 | $523 |
| 6 in | 8.89 cu yd | 12.44 | $560 | $710 |
| 8 in | 11.85 cu yd | 16.59 | $746 | $896 |
| 10 in | 14.81 cu yd | 20.74 | $933 | $1,083 |
| 12 in | 17.78 cu yd | 24.89 | $1,120 | $1,270 |

Every 1 in of depth on 480 sq ft costs about 2.07 tons, or $93 of stone. That is the number to remember when a contractor proposes 8 in instead of 6: it is $186 more stone, and it is only worth it over soft ground or for a delivery truck turning around.

### A driveway is two layers, not one

Six inches of one stone is a mediocre driveway. The standard build is a 4 in base of 1&frac12; in crushed stone with fines, often sold as #304 or crusher run, topped with 2 in of clean 3/4 in stone or #57. The base locks together under compaction and carries the load; the top course sheds water and looks finished.

Split the tonnage accordingly: 480 sq ft at 4 in of base is 8.30 tons and 2 in of top is 4.15 tons, which is the same 12.44 total. Buying 12.44 tons of clean stone and no base gives you a loose mat that ruts the first spring, because clean stone has no fines to bind it.

### What moves the delivered price

- Stone type: crusher run $25–$45 per ton, #57 $35–$55, pea gravel $40–$80
- Haul distance: the quarry sets the price, so a 10 mile haul is far cheaper than 40
- Depth: each inch on 480 sq ft adds 2.07 tons and about $93
- Edging: steel or pressure-treated at $6–$15 per linear foot, or the edges spread
- Geotextile fabric: $0.40–$0.90 per sq ft, or $190–$430 on 480 sq ft
- Grading and compaction: $300–$800 if the site needs a crown cut or a soft spot dug out

### Maintenance and top-dressing

Gravel drives lose 1–2 in of surface every two to three years to plowing, tires and rain. Top-dressing 1 in over 480 sq ft takes 2.07 tons, about $93 of stone plus a delivery fee, and it is far cheaper than rebuilding. Do it in spring when the frost has finished heaving the surface.

#### Snow removal on gravel

Set the plow shoes 1–2 in above the surface or you will push half the top course into the lawn each winter. A 1 in skim over 480 sq ft is 2 tons of stone, which turns a $93 annual top-dress into a $300 rebuild. Gravel drives also need a crown of 2–3% so meltwater runs to the edges rather than down the middle.

### Mistakes that cost a second load

#### Subgrade before stone

The first is spreading on soft subsoil without fabric. Gravel pressed into mud disappears within a season, and the fix is to dig out 6 in, lay fabric and start again. The second is ordering one stone type for both layers, which produces either a loose surface or a base that will not drain.

The third is skipping compaction. A plate compactor rented for $70–$100 a day, run over the base in two 2 in lifts, is what makes the driveway hold up; a single 4 in lift compacts unevenly and ruts under a loaded truck. Water the base lightly before each pass, since stone compacts best at optimal moisture.

### DIY versus professional

Having 12.44 tons delivered and spreading it with a wheelbarrow is 60–80 trips and a hard weekend; a rented skid steer at $250–$400 a day turns it into an afternoon. The stone itself costs the same either way, so DIY saves the $300–$800 of grading labor rather than the material. Hire out the subgrade work if the site slopes, drains toward the house or needs a culvert, because a driveway that sends water into a foundation costs more to fix than it saved.

## FAQ

### How many tons of gravel for a 480 sq ft driveway?

12.44 tons at 6 in deep, which is 8.89 cubic yards. At 4 in it is 8.30 tons, and at 8 in it is 16.59 tons.

### How much does a gravel driveway cost for 480 sq ft?

$710 at $45 per ton plus $150 delivery. That is 12.44 tons of stone at $560, or $1.48 per square foot installed.

### How many tons are in a cubic yard of gravel?

About 1.4 tons for crushed stone. Limestone and granite run close to that, while lighter aggregates such as lava rock are nearer 0.9.

### How deep should a gravel driveway be?

4 in of crushed base topped with 2 in of clean stone, 6 in total for a car driveway. Go to 8 in over soft ground or where a delivery truck turns around.

### How much gravel does 1 inch of depth add?

On 480 sq ft, 2.07 tons and about $93. That is the number to check when a quote proposes a deeper base than you expected.

### Should I use landscape fabric under a gravel driveway?

Yes. Geotextile at $0.40–$0.90 per sq ft keeps stone from sinking into subsoil, which otherwise costs a full rebuild within a season.

### How often do I need to add gravel?

A 1 in top-dress every two to three years, which is 2.07 tons and about $93 of stone on 480 sq ft. Plowing without raised shoes shortens that to every year.

### Is gravel cheaper than asphalt?

Yes, at $1.48 per sq ft delivered against $4–$8 per sq ft for asphalt. Gravel needs top-dressing every few years, while asphalt needs sealing every three to five.

### What is the best gravel for a driveway?

Crusher run or #304 for the 4 in base because the fines bind it, and #57 clean stone for the 2 in surface. Pea gravel costs $40–$80 per ton and ruts under tires.

### Can I spread gravel myself?

Yes for a flat, short run. Twelve tons is 60–80 wheelbarrow trips; a rented skid steer at $250–$400 a day does it in hours.

## Method and sources

Methodology: Cost ranges reflect 2026 U.S. national averages for materials and labor; regional pricing varies, so use results as a planning baseline and confirm with local quotes.

Last updated: 2026-11-18.
- Crushed gravel weighs about 1.4 tons per cubic yard; $30-$80 per ton delivered, US average 2026.