# Drilling Time Calculator

Calculate drilling time from hole depth, spindle RPM and feed per revolution. Solve for depth, RPM or feed. Free and instant.

## Quick answer

**Quick answer:** with the default inputs (1 in, 1,000 RPM, 0.01 in/rev), the drilling time is **0.2 min**. Change any input to update the result.

## Default calculation

Values computed by this calculator at exactly the default inputs listed below.

### Inputs (defaults)

| Input | Value | Unit |
| --- | --- | --- |
| Hole depth | 1 | in |
| Spindle speed | 1000 | RPM |
| Feed per revolution | 0.005 | in/rev |

### Outputs at these defaults

| Output | Value | Unit |
| --- | --- | --- |
| Drilling Time | 0.2 | min |

## Formula

```text
T = depth ÷ (RPM × feed per rev)
```

## Inputs

| Variable | Type | Unit | Default |
| --- | --- | --- | --- |
| Hole depth | number | in | 1 |
| Spindle speed | number | RPM | 1000 |
| Feed per revolution | number | in/rev | 0.005 |
| Drilling time | number | min | 0.2 |

## Outputs

| Result | Format |
| --- | --- |
| Drilling Time | primary |

## How it works

### What the calculator returns

Give it a hole depth, a spindle speed and a feed per revolution and it returns the in-cut time in minutes. At the defaults, a 1 in deep hole at 1,000 RPM and 0.005 in/rev takes 0.2 minutes, or 12 seconds. The tool also solves the other way: set a cycle time and it will tell you the RPM or feed per revolution needed to hit it.

### The formula and the feed rate behind it

Depth is the distance the drill travels, in inches. RPM is spindle speed, and feed per revolution is the advance per turn. RPM times feed per revolution is the feed rate in inches per minute, so the whole expression is depth divided by feed rate and lands in minutes. At 1,000 RPM and 0.005 in/rev the feed rate is 5 IPM, and 1 in divided by 5 IPM is 0.2 minutes.

That makes the time sensitive to both terms. Doubling the RPM halves the time at the same feed, and doubling the feed per revolution halves it again. What the formula does not contain is any allowance for the drill point, for retracts or for entering and exiting the cut, which is why it is always a lower bound rather than a cycle time you can quote directly.

#### The drill point adds travel

A 118&deg; twist drill has a conical point that is not part of the fluted depth. For a hole of a given depth the tip has to travel about 0.3 times the drill diameter beyond that depth before the full diameter is cut. A 1/2 in drill in a 1 in deep hole therefore travels roughly 1.15 in, and the time becomes 1.15 ÷ 5 = 0.23 minutes instead of 0.2. That is 15 percent more, which on a 10,000-hole job is most of a shift.

### Worked example at the defaults

Start from 1 in deep, 1,000 RPM, 0.005 in/rev. Feed rate = 1,000 × 0.005 = 5 IPM. Time = 1 ÷ 5 = **0.2 minutes per hole**. If the drill is 1/2 in and you include the 0.15 in point allowance, the travel becomes 1.15 in and the time rises to 0.23 minutes. Adding a 0.05 minute tool change every 200 holes adds 0.00025 minutes per hole, which vanishes into rounding at this scale.

Push it to a batch. Two hundred holes at 0.2 minutes is 40 minutes of spindle time, or 66.7 minutes once the point allowance is included. At a shop rate of $75 per hour, the in-cut cost is $50 per hundred holes on the raw formula and about $83 per hundred with the point. That gap is why quoting from the bare formula understates job cost on shallow holes, where the point allowance is proportionally largest.

### Depth, speed and feed compared

| Hole depth (in) | RPM | Feed (in/rev) | In-cut time (min) | With 0.15 in point (min) |
| --- | --- | --- | --- | --- |
| 0.5 | 1000 | 0.005 | 0.1 | 0.13 |
| 1.0 | 1000 | 0.005 | 0.2 | 0.23 |
| 1.0 | 2000 | 0.005 | 0.1 | 0.115 |
| 2.0 | 1000 | 0.005 | 0.4 | 0.43 |
| 1.0 | 1000 | 0.010 | 0.1 | 0.115 |

Each row is the default calculation with one term changed. The 2,000 RPM row halves the time without changing chip thickness, which is the safe way to speed up. The 0.010 in/rev row also halves the time but doubles the chip, which only works if the drill is large enough and rigid enough to take it.

### What moves the cycle time

- Depth: time scales linearly, so a 3 in hole takes three times as long as a 1 in hole
- Spindle speed: time falls in inverse proportion to RPM
- Feed per revolution: time falls in inverse proportion, but chip thickness rises with it
- Drill point: adds about 0.3 times the diameter to the travel on a standard 118&deg; point
- Peck cycles: each retract adds travel, so deep holes cost more than depth divided by feed
- Tool changes: a drill that wears out mid-batch adds minutes you did not schedule

### Peck drilling changes the arithmetic

Deep holes are drilled in pecks: the drill advances a short distance, retracts to clear chips, then re-enters. A common rule is a peck depth of one diameter, so a 1/4 in drill in a 2 in hole makes eight pecks. Each peck adds a retract and a rapid back to depth, and the retract is usually at a higher feed than the cut, but it still costs time. In practice pecking can add 30–60 percent to the in-cut time on holes deeper than four diameters.

Two things follow. First, the calculator gives the floor, not the cycle time, on any hole deep enough to peck. Second, time and tool life pull in opposite directions: skipping pecks saves minutes per hole but risks packing chips and snapping the drill, which costs far more than the time saved. On holes up to about two diameters deep, pecking is usually unnecessary in aluminum and often unnecessary in mild steel.

### Common mistakes

#### Using hole depth as travel

The most frequent error is entering the print dimension and stopping there. A blind hole 0.75 in deep with a 118&deg; point needs 0.75 plus 0.3 times the diameter of travel, and a through hole needs the depth plus the point plus a breakout allowance. Enter the distance the drill actually moves, or accept that the answer is optimistic by 10–20 percent on small drills.

#### Mixing feed per revolution with feed per minute

If you enter 5 instead of 0.005 for feed per revolution, the calculator returns 0.0002 minutes per hole and the error is invisible unless you sanity-check it. A 1 in hole cannot be drilled in 0.012 seconds. Estimate the answer first: at 5 IPM, one inch takes about 12 seconds, so anything near a hundredth of a minute is a units error.

#### Reporting spindle time as job time

- Add the point and breakout allowance to the depth
- Add peck retracts for holes deeper than four diameters
- Add tool change, positioning and load and unload time for the batch

### Checking the result against the machine

0.2 minutes per hole is 300 holes an hour in theory. No machine drills 300 holes an hour with 1 in of travel, because positioning between holes, chip clearing and part handling all sit outside the formula. Use the calculated time to compare drill sizes, speeds and feeds against each other, and multiply by 1.5 to 2.5 for a realistic shop-floor rate. If the resulting batch time is close to a delivery date, the constraint is usually the tool change or the load and unload, not the cut.

## FAQ

### How do I calculate drilling time?

Divide the travel distance by RPM times feed per revolution. With 1 in of travel at 1,000 RPM and 0.005 in/rev, the feed rate is 5 IPM and the time is 0.2 minutes, or 12 seconds.

### How long does it take to drill a 1 inch deep hole?

About 0.2 minutes at 1,000 RPM and 0.005 in/rev. With a 1/2 in drill and a 118&deg; point the true travel is 1.15 in and the time is 0.23 minutes, roughly 14 seconds.

### Does the calculator include peck drilling?

No. It returns in-cut time for a single continuous advance. Peck retracts on holes deeper than four diameters typically add 30–60 percent, so a 2 in hole with eight pecks runs closer to 0.55 minutes than 0.4.

### How can I drill a hole faster?

Raise RPM first, because it cuts time without increasing chip thickness. Going from 1,000 to 2,000 RPM halves 0.2 minutes to 0.1. Raising feed per revolution from 0.005 to 0.010 also halves the time but doubles the load on the drill.

### What feed per revolution should a 1/4 in drill use?

0.004–0.006 in/rev in mild steel. At 1,000 RPM that is 4–6 IPM, so a 1 in deep hole takes 0.17–0.25 minutes before the point allowance.

### Why is my actual time much longer than the calculated time?

Because the formula counts only the cut. Tool changes, positioning between holes, peck retracts and part handling sit outside it. A realistic shop-floor multiplier for a drilled batch is 1.5 to 2.5 times the calculated in-cut time.

### Does a bigger drill take longer to drill the same hole?

Only through the point allowance, which is about 0.3 times the diameter — 0.04 in on a 1/8 in drill versus 0.15 in on a 1/2 in drill. A bigger drill usually runs a heavier feed per revolution, which offsets most of that extra travel.

### How do I allow for the drill point?

Add about 0.3 times the drill diameter to the hole depth for a 118&deg; point, and about 0.2 times for a 135&deg; split point. A 1/2 in drill in a 1 in hole becomes 1.15 in of travel.

### What does one drilled hole cost at a $75 per hour shop rate?

At 0.2 minutes of spindle time the cutting cost is $0.25. With the point allowance it is $0.29, and once you add handling the real cost per hole is usually $0.50–$1.00 on a manual drill press.

## Method and sources

Methodology: Formulas follow standard machining practice consistent with Machinery’s Handbook conventions; always verify final settings against the tooling supplier’s data.

Last updated: 2026-11-17.
- Drilling time = depth ÷ (RPM × feed per revolution).