---
slug: drill-feed-calculator
title: "Drill Feed Calculator"
category: machining
updated: 2026-11-17
canonical: https://calcseed.com/c/machining/drill-feed-calculator/
html: /c/machining/drill-feed-calculator/
---

# Drill Feed Calculator

Calculate drill feed rate (IPM) from spindle RPM and feed per revolution, or solve for RPM or feed per rev. Free and instant.

## Quick answer

**Quick answer:** with the default inputs (1,000 RPM, 0.01 in/rev), the feed rate is **5 IPM**. Change any input to update the result.

## Default calculation

Values computed by this calculator at exactly the default inputs listed below.

### Inputs (defaults)

| Input | Value | Unit |
| --- | --- | --- |
| Spindle speed | 1000 | RPM |
| Feed per revolution | 0.005 | in/rev |

### Outputs at these defaults

| Output | Value | Unit |
| --- | --- | --- |
| Feed Rate | 5 | IPM |

## Formula

```text
Feed rate = RPM × feed per revolution
```

## Inputs

| Variable | Type | Unit | Default |
| --- | --- | --- | --- |
| Spindle speed | number | RPM | 1000 |
| Feed per revolution | number | in/rev | 0.005 |
| Feed rate | number | IPM | 5 |

## Outputs

| Result | Format |
| --- | --- |
| Feed Rate | primary |

## How it works

### What the calculator returns

Enter a spindle speed and a feed per revolution and the tool returns the feed rate in inches per minute (IPM). At the defaults, 1,000 RPM times 0.005 in/rev gives 5 IPM. It also runs backwards: type a target feed rate and it solves for the RPM or the feed per revolution that produces it, which is how you check a programmed feed against the drill you actually have in the spindle.

### The formula, part by part

RPM is the spindle speed in revolutions per minute. Feed per revolution is the distance the drill advances into the work during one complete turn, in inches. Multiplying the two turns a per-turn distance into a per-minute distance, which is what the machine feed command actually sets. Both terms are in inches and minutes, so no conversion constant appears — the result is already IPM.

Feed per revolution is the number drill charts publish, and it scales with diameter. A 1/16 in drill in mild steel runs around **0.001–0.002** in/rev, while a 1/2 in drill takes **0.008–0.012** in/rev. The reason is bending strength: a small drill snaps if it is pushed, so the chip has to stay thin. Doubling the diameter roughly doubles the allowable feed per revolution, which is why a chart lookup beats a single rule of thumb.

#### Feed per revolution is not chip load

A standard twist drill has two cutting lips, so the chip each lip takes is half the feed per revolution. A 0.010 in/rev feed produces 0.005 in chips per lip. If you take a chip-load table written for milling cutters and apply it directly to a drill, you feed the drill at double the intended rate. Divide the milling chip load by the flute count before using it on a drill, and remember that a drill has two flutes, not four.

### Worked example at the defaults

Take a 1,000 RPM spindle and 0.005 in/rev. Feed rate = 1,000 × 0.005 = **5 IPM**. Push that through a 1 in deep hole and the drill is in the cut for 1 ÷ 5 = 0.2 minutes, or 12 seconds. Forty holes of the same depth take 40 × 0.2 = 8 minutes of spindle time before you add tool changes, positioning and peck retracts.

Now hold the RPM and halve the feed to 0.0025 in/rev. The feed rate drops to 2.5 IPM and the same hole takes 0.4 minutes — double. That is the trade the calculator exposes: feed per revolution buys speed, and the limit on it is drill strength and chip evacuation, not the spindle motor. Going the other way, raising RPM to 2,000 at 0.005 in/rev gives 10 IPM without changing chip thickness at all, which is usually the safer way to go faster in aluminum.

### Feed per revolution by drill size

| Drill diameter | Mild steel (in/rev) | Aluminum (in/rev) | IPM at 1,000 RPM (steel) |
| --- | --- | --- | --- |
| 1/16 in | 0.001–0.002 | 0.002–0.003 | 1–2 |
| 1/8 in | 0.002–0.004 | 0.004–0.006 | 2–4 |
| 3/16 in | 0.003–0.005 | 0.005–0.008 | 3–5 |
| 1/4 in | 0.004–0.006 | 0.006–0.010 | 4–6 |
| 3/8 in | 0.006–0.009 | 0.009–0.014 | 6–9 |
| 1/2 in | 0.008–0.012 | 0.012–0.018 | 8–12 |

The last column is just the steel range multiplied by the default 1,000 RPM, so it shows what the chart converts to at the calculator&rsquo;s starting point. The 1/2 in drill at 0.012 in/rev wants 12 IPM, more than twice the default, which tells you the default is a conservative floor rather than a production number. At 1,000 RPM that same 1/2 in drill is also well under the surface speed it can survive in mild steel, so a real program raises both the RPM and the feed together.

### What moves the feed rate

- Spindle speed: doubling RPM doubles IPM at the same feed per revolution
- Feed per revolution: doubling it doubles IPM and doubles chip thickness
- Drill diameter: allowable feed per revolution rises roughly with diameter up to about 1/2 in
- Material: aluminum takes 1.5–2.5 times the feed per revolution of mild steel at the same diameter, stainless and titanium take less
- Hole depth: past roughly 4 times diameter, chip evacuation forces a lighter feed and peck cycles
- Machine type: a drill press quill may top out near 0.010 in/rev no matter what the chart says

Spindle speed is the only one of these that changes feed rate without touching chip thickness. That makes it the first knob to turn when a hole is running slow but the drill is surviving. Feed per revolution is the knob you turn when the drill is rubbing, squealing and work-hardening the hole instead of cutting it.

### Working in metric

With feed in millimeters per revolution, the same multiplication gives millimeters per minute: 0.127 mm/rev at 1,000 RPM is 127 mm/min. To convert a metric feed to inches per revolution, divide by 25.4 — 0.127 mm/rev is exactly 0.005 in/rev, the calculator&rsquo;s default. Keep one unit system through the whole calculation. Mixing mm/rev with an inch-based IPM target is the most common way to end up out by a factor of 25.

### Common mistakes

#### Reading the chart in the wrong units

Many European drill charts list feed in mm/rev and speed in m/min. Dropping 0.1 mm/rev into an IPM calculation as if it were 0.1 in/rev feeds the drill 25 times too hard and breaks it on the first hole. Check the column header before you type the number, and check whether the speed column is RPM or surface speed in m/min, which is a different quantity entirely.

#### Forgetting the drill point

Feed rate describes how fast the drill advances, but the distance it must travel is not the hole depth. A 118&deg; drill point adds about 0.3 times the diameter to the travel, so a 1/2 in drill cutting a 1 in deep hole travels roughly 1.15 in. The feed rate itself is unchanged, but the time is 15 percent longer than a straight depth calculation predicts. Add the point allowance before you quote cycle time.

#### Three checks before the first hole

- Confirm the feed per revolution is in inches, not millimeters
- Confirm the drill has two flutes before converting a chip load
- Confirm the machine can reach the resulting IPM at the chosen RPM

### Matching the number to the machine

A calculated 5 IPM is a light feed for a 10 hp machining center and a heavy one for a benchtop drill press with a 1/3 hp motor. Check two limits before you commit: the machine&rsquo;s maximum feed rate in IPM, and the thrust available at the quill or spindle. A drill that needs more thrust than the machine can supply will stall even at a feed rate the motor could theoretically drive. When the calculated feed exceeds either limit, cut feed per revolution first and keep the RPM, because that preserves surface speed and chip thinning is easier to manage than a stalled spindle.

## FAQ

### How do I calculate drill feed rate?

Multiply spindle RPM by feed per revolution. At 1,000 RPM and 0.005 in/rev the answer is 5 IPM. If the feed is in mm/rev the result is mm/min, so convert before comparing it with an inch-based program.

### What feed rate should a 1/4 in drill run in mild steel?

Use 0.004–0.006 in/rev. At 1,500 RPM that converts to 6–9 IPM. At the calculator default of 1,000 RPM the same feed works out to 4–6 IPM, which is on the gentle side for that drill.

### Is feed per revolution the same as chip load?

No. A two-flute drill splits the feed between two lips, so chip load equals feed per revolution divided by two. A 0.010 in/rev feed makes 0.005 in chips.

### Why does my drill squeal and work-harden the hole?

The feed is too light. Below roughly 0.002 in/rev a small drill rubs instead of cutting, and the rubbing work-hardens the surface so the next pass cuts even harder material. Raise the feed per revolution and hold the RPM.

### Can I just raise RPM to drill faster?

Up to the surface speed limit for the material and drill coating. At 1,000 RPM and 0.005 in/rev you get 5 IPM; at 2,000 RPM the same feed gives 10 IPM with identical chip thickness, so the drill sees no extra bending load.

### How do I convert 0.1 mm/rev to inches per revolution?

Divide by 25.4. That gives 0.0039 in/rev, close to 0.004. Running it at 1,000 RPM produces 100 mm/min, or about 3.9 IPM.

### Does the drill point change the feed rate?

No, but it changes the travel distance and therefore the time. A 118&deg; point adds about 0.3 times the diameter, so a 1/2 in drill in a 1 in hole travels about 1.15 in and takes 15 percent longer than the depth alone suggests.

### What is a realistic feed rate for a 1/2 in drill?

8–12 IPM at 1,000 RPM in mild steel, matching 0.008–0.012 in/rev. In aluminum the same drill can take 0.012–0.018 in/rev, which is 12–18 IPM at that speed.

### How do I find the RPM for a target feed rate?

Divide the feed rate by the feed per revolution. A 6 IPM target at 0.004 in/rev needs 1,500 RPM. Check that the resulting surface speed is within the drill and material limits before running it.

## Method and sources

Methodology: Formulas follow standard machining practice consistent with Machinery’s Handbook conventions; always verify final settings against the tooling supplier’s data.

Last updated: 2026-11-17.
- Drill feed rate = RPM × feed per revolution.
