# ADU Cost Calculator

Estimate accessory dwelling unit cost by type: garage conversion at $110/sq ft, attached ADU at $180/sq ft or detached ADU at $280/sq ft.

## Quick answer

**Quick answer:** with the default inputs (600 sq ft, 280, $5,000), the total adu cost is **$173,000.00**. At these inputs: construction cost = **$168,000.00**. Change any input to update the result.

## Default calculation

Values computed by this calculator at exactly the default inputs listed below.

### Inputs (defaults)

| Input | Value | Unit |
| --- | --- | --- |
| ADU floor area | 600 | sq ft |
| ADU type | 280 |  |
| Permits, plans & utility connections | 5000 | $ |

### Outputs at these defaults

| Output | Value | Unit |
| --- | --- | --- |
| Total ADU cost | 173000 |  |
| Construction cost | 168000 |  |

## Formula

```text
total = ADU sq ft × type rate + permits & connections
```

## Inputs

| Variable | Type | Unit | Default |
| --- | --- | --- | --- |
| ADU floor area | number | sq ft | 600 |
| ADU type | select |  | 280 |
| Permits, plans & utility connections | number | $ | 5000 |

## Outputs

| Result | Format |
| --- | --- |
| Total ADU cost | primary |
| Construction cost | currency |
| Total ADU cost | currency |

## How it works

### What the total ADU cost includes

An ADU budget is construction plus soft costs. Construction is floor area times a rate that depends on how much of the structure already exists. Soft costs are permits, plan review, utility connections and impact fees, which the calculator collects into one line. At the defaults — **600 sq ft** detached at **$280/sq ft** plus **$5,000** — the total is **$173,000**, or **$288/sq ft** all in.

### Why the three rates differ so much

The rate is a proxy for how much building you are actually buying. A garage conversion at **$110/sq ft** reuses the slab, walls, roof and often the electrical service, so the money goes to insulation, drywall, a bathroom and a kitchenette. An attached ADU at **$180/sq ft** adds a foundation, exterior walls and a roof tie-in. A detached unit at **$280/sq ft** is a small house from the ground up, including its own service panel, water lateral and sewer tap.

The gap is not linear in square footage, which is the point of a per-type rate. Detached units carry fixed costs — a trench, a meter, a second address — that do not shrink when the unit does. A 400 sq ft detached ADU still needs its own connection, so its cost per foot runs closer to **$292** than the headline **$280**.

### Worked example at the defaults

Construction: **600 × $280 = $168,000**. Soft costs: **$5,000**. Total: **$173,000**. Divide back: **$173,000 ÷ 600 = $288/sq ft**. That $288 is the number to compare against a contractor&rsquo;s all-in bid, not the $280 headline rate.

Run the same 600 sq ft through the other two types and the spread is dramatic. Garage conversion: **600 × $110 = $66,000**, plus $5,000, gives **$71,000**. Attached: **600 × $180 = $108,000**, plus $5,000, gives **$113,000**. The $102,000 gap between a garage conversion and a detached unit is the price of a foundation, a roof and three utility trenches.

### 2026 ADU cost by type, low to high

| ADU type | Rate | 600 sq ft low | 600 sq ft high |
| --- | --- | --- | --- |
| Basement conversion | $150/sq ft | $95,000 | $113,000 |
| Garage conversion | $110/sq ft | $71,000 | $84,200 |
| Attached ADU | $180/sq ft | $113,000 | $134,600 |
| Detached ADU | $280/sq ft | $173,000 | $206,600 |

The high column applies a **20%** contingency, which is not padding — it is the observed spread between a bid and a final invoice on ADU work. Sites with slope, a long utility run or an older main house that needs its panel upgraded routinely land at the top of the band. Budget the high column and treat anything under it as margin.

### What moves the number

- Utility trenches: a detached unit runs $8,000–$25,000 depending on distance to the main
- Panel capacity: a 100 A service usually needs a 200 A upgrade, adding $3,000–$6,000
- Kitchenette and bath: together 30–40% of the construction budget
- Site work: slope, retaining walls and drainage add $10,000–$40,000
- Fire sprinklers: required in some jurisdictions for new detached units, $5,000–$12,000

#### Impact fees and the small-unit exemption

Many states now waive or cap impact fees on ADUs under **750 sq ft**, and California forbids them entirely on units under 750 sq ft. On a 600 sq ft unit that exemption can be worth **$5,000–$15,000**, which is two to three times the entire $5,000 soft-cost default. Check the local schedule before you assume the default is realistic; a jurisdiction that still charges school and park fees will push soft costs past $15,000.

#### Garage conversion trade-offs

At $110 a foot the garage is the cheapest path, but three constraints bite. Ceiling height must reach **7 ft** after a raised floor for plumbing. The slab must accept a bathroom drain, which sometimes means cutting and re-pouring **40–80 sq ft**. And you lose parking, which matters in cities with driveway or parking-minimum rules. Budget **$5,000–$12,000** for slab and ceiling work on top of the $110 rate.

### Does the ADU pay for itself

Rents for a 600 sq ft ADU run **$1,200–$2,500** a month depending on market. At $1,800 a month and 90% occupancy, gross rent is **$19,440** a year. Subtract $3,000 for insurance, maintenance and vacancy and you net about **$16,400**, which against a $173,000 build is a **10.5-year** simple payback. A garage conversion at $71,000 pays back in about **4.3 years**.

Appraisers generally credit an ADU at **25–35%** of the main property value, and in high-rent metros the added value can exceed the build cost on day one. The weak case is a detached unit in a low-rent market: $173,000 out, $1,100 a month in, and a 15-year payback that only works if you count the equity separately.

Carrying cost sits outside the build price and still counts. A construction loan drawn in stages on a $173,000 project accrues roughly **$6,000–$9,000** in interest over a 12-month build at current rates, and permit review adds months of it before a shovel moves. If the unit is financed with a HELOC instead, the interest starts the day the first draw clears, whether or not framing has begun.

### Budgeting without surprises

- Get the utility connection quote before design; it is the most common overrun
- Confirm the panel has two open slots before assuming no electrical upgrade
- Price the plan set separately; drafting runs $3,000–$8,000 on its own
- Ask whether the jurisdiction counts the ADU against floor-area ratio limits

The most expensive mistake is designing before checking the utility tap. A detached unit 120 feet from the main can need a longer sewer lateral than the budget assumed, and sewer work is priced by the foot at **$50–$120**. That single line can add $14,000 to a project that was sized to the $173,000 default, which is why the high column in the table exists.

## FAQ

### How much does a 600 sq ft ADU cost?

A 600 sq ft detached ADU is $168,000 of construction plus $5,000 in permits and connections, or $173,000 total at $288 a foot. The same size as a garage conversion is $71,000 and as an attached unit $113,000.

### Is a garage conversion cheaper than a detached ADU?

Yes, by a wide margin. A 600 sq ft garage conversion runs $71,000 against $173,000 for a detached unit, because the slab, walls and roof already exist. Budget $5,000–$12,000 extra if the ceiling must be raised or the slab cut for a drain.

### Why do ADU permits cost $5,000 or more?

Plan review, energy compliance, sewer and water connection charges and inspections stack up. Units under 750 sq ft are exempt from impact fees in many states, which can save $5,000–$15,000 on a 600 sq ft build.

### How much rent can an ADU earn?

A 600 sq ft unit rents for $1,200–$2,500 a month in most US metros. At $1,800 with 90% occupancy, gross is $19,440 a year and the net payback on a $173,000 build is about 10.5 years.

### Does an ADU add value to my home?

Appraisers typically credit 25–35% of the main property value. On a $600,000 house that is $150,000–$210,000, which can exceed the $173,000 cost of a detached 600 sq ft unit.

### How long does an ADU take to build?

Garage conversions take 3–5 months, attached units 6–9, and detached units 9–14 including permitting. Permit review alone runs 2–6 months in most jurisdictions.

### Do I need to upgrade my electrical panel for an ADU?

Usually. A 100 A service with an existing electric range and dryer rarely has capacity for a second dwelling. A 200 A upgrade costs $3,000–$6,000 and should be in the budget from the start.

### Can I finance an ADU build?

HELOCs, cash-out refinancing and construction loans are the common routes. Some state and city programs grant $25,000–$40,000 toward pre-approved ADU designs, which is worth checking before you borrow.

### What is the cheapest ADU type?

A garage conversion at $110/sq ft, or $71,000 for 600 sq ft including $5,000 of permits. A basement conversion is next at $150/sq ft and $95,000, and it only wins if the garage needs a raised ceiling and slab work, which adds $5,000–$12,000.

## Method and sources

Methodology: Cost ranges reflect 2026 U.S. national averages for materials and labor; regional pricing varies, so use results as a planning baseline and confirm with local quotes.

Last updated: 2026-11-18.
- 2026 ADU market rates: garage conversion $90-140/sq ft, attached $150-220/sq ft, detached $250-330/sq ft.