Working Days Calculator
Count the business days between two dates, excluding weekends.
What counts as a working day here
A working day is any Monday through Friday. The calculator counts every date from the start date through the end date, inclusive of both, marks each Saturday and Sunday as a weekend day, and reports the remainder as working days. Public holidays are not removed, because they differ by country, state and employer; treat the result as a weekend-adjusted count, not a holiday-adjusted one.
How the count works
The engine walks the calendar one day at a time. The total span includes both endpoints, so 1 January to 2 January is 2 total days. Every date whose weekday is Saturday or Sunday increments the weekend counter, and the working-day figure is whatever is left. Full weeks are the total span divided by 7, shown as a decimal.
Worked example: all of 2026
With the default dates of 1 January 2026 to 31 December 2026, the span is 365 days inclusive of both endpoints. A 365-day year is 52 weeks plus 1 day; 2026 begins on a Thursday, so the extra day is a Thursday and weekends come out at exactly 52 Saturdays + 52 Sundays = 104. That leaves 365 − 104 = 261 working days, and 365 ÷ 7 = 52.14 full weeks.
| Period of 2026 | Total days | Working days |
|---|---|---|
| January | 31 | 22 |
| Q1 (Jan–Mar) | 90 | 64 |
| Q2 (Apr–Jun) | 91 | 65 |
| H1 (Jan–Jun) | 181 | 129 |
| Full year | 365 | 261 |
A typical month holds 20–23 working days. The range is wide because months run 28–31 days and the two weekend days land differently: a 30-day month that starts on a Saturday loses 10 days to weekends, while the same month starting on a Monday loses only 8.
Two rules of thumb from the 261 figure
First, 261 ÷ 12 = 21.75 working days in an average month, so a monthly billing cycle priced at 22 working days is slightly conservative and will drift a day or two ahead of the calendar over a year. Second, a 90-day probation or trial period contains 64–66 working days — the 64 that Q1 2026 shows is representative — which is roughly a quarter of the calendar. When an offer letter says “90 days”, check whether the drafter means calendar or working days, because the working-day reading stretches the same interval by about six weeks.
Subtracting public holidays
For a true business-day count, subtract the holidays your organisation observes. The United States federal schedule has 11 holidays in 2026, and every one of them falls on a weekday:
- New Year’s Day, Thursday 1 January 2026
- Martin Luther King Jr. Day, Monday 19 January 2026
- Washington’s Birthday, Monday 16 February 2026
- Memorial Day, Monday 25 May 2026
- Juneteenth, Friday 19 June 2026
- Independence Day, Saturday 4 July 2026, observed Friday 3 July
- Labor Day, Monday 7 September 2026
- Columbus Day, Monday 12 October 2026
- Veterans Day, Wednesday 11 November 2026
- Thanksgiving Day, Thursday 26 November 2026
- Christmas Day, Friday 25 December 2026
With all 11 removed, 2026 offers 261 − 11 = 250 working days. If your organisation also closes the day after Thanksgiving or Christmas Eve, drop another 1–2 days from that figure.
Payroll and project planning
Three scheduling numbers fall straight out of the 261 figure. A semimonthly payroll (24 pay dates a year) averages 261 ÷ 24 ≈ 10.9 working days per period, while a biweekly schedule runs 26 periods of about 10 working days each. For project planning, a 65-working-day Q2 is 13 working weeks, which is why a three-month project and a 60-working-day project are rarely the same thing: the calendar quarter has 13 weekends hiding inside it.
Common mistakes
- Forgetting the inclusive endpoints. The count includes both the start and end date, so a Monday-to-Friday span is 5 working days, not 4.
- Assuming holidays are removed. The 261 figure excludes weekends only. The 11 US federal holidays bring it down to 250.
- Exporting the pattern abroad. Several countries run Sunday–Thursday work weeks; in those markets a Saturday-and-Sunday weekend count is wrong by design.
- Counting half days as full days. This tool works in whole days only; a half-day Friday still consumes one working day here.
Weekends versus calendar days
The same 365-day span measures 261 working days here but 365 calendar days on a plain date-difference tool — a 28.5% gap that explains why delivery estimates and staffing plans built on calendar days run chronically late. If your upstream tool only reports calendar days, a fast correction is to multiply by 5/7: 365 × 5/7 ≈ 260.7, within one day of the exact 261 this walk produces.
When the shortcut breaks
The 5/7 factor is an average, not a law, and short spans expose the difference. A 10-working-day span covers 12 calendar days when it starts on a Monday (2 weekend days inside) but 14 calendar days when it starts on a Thursday (4 weekend days inside) — a two-day swing on the same nominal workload. Spans that cross a long holiday weekend or a 31-day month drift further, so use the multiplication only for rough planning beyond a month, and run the exact count here for anything with a deadline attached: a contract clause, a payroll cut-off or a notice period.
Frequently asked questions
How many working days are there in 2026?
261, excluding weekends only. After removing the 11 US federal holidays, all of which fall on weekdays in 2026, the count is 250.
Does the calculator include public holidays?
No. It excludes Saturdays and Sundays only. Subtract your local holidays manually — 11 federal holidays take the 2026 total from 261 to 250.
Is the end date included in the count?
Yes, the count is inclusive of both the start and end dates, so Monday 5 January to Friday 9 January 2026 is 5 working days.
How many weekend days are in a year?
In 2026, exactly 104: 52 Saturdays and 52 Sundays. A leap year starting on a Saturday, such as 2028, produces 106 (53 of each), while 2024 starts on a Monday and keeps 104 despite the extra day.
How many working days are in January 2026?
22. January has 31 days, of which 9 fall on a weekend (5 Saturdays and 4 Sundays).
How many working days are in a typical month?
Between 20 and 23. The exact value depends on the month’s length and on which weekdays the Saturdays and Sundays land on.
Why does my company’s working-day count differ?
Employers subtract holidays, run four-day weeks, or observe regional weekends such as Friday–Saturday. This tool’s 261 is the weekend-only baseline those adjustments start from.
How many working days are between 1 January and 31 March 2026?
64. The quarter contains 90 days and 26 weekend days, leaving 64 before any holiday subtraction.
Method and sources
- Calendar counting of weekdays (ISO 8601 date handling).